Electric Vehicle Chargers

  • Information: Electrical vehicle chargers require the submittal and review of a commercial alteration permitElectrical work that is part of an alteration shall be included in that alteration permit.
  • Submittal Requirements: An Electric vehicle charger permit may be submitted electronically by applying through eTRAKiT, then selecting Commercial Alteration and EV charger subtype. Required submittal documents:
    • Commercial application
    • Complete electrical plans including load calculations, one-line diagram, and panel schedule(s)
    • Site plan and/or floor plan
    • Manufacturer specifications
  • Inspection Required: Electric Rough; Electric Final
  • Fees: $322 Minimum. See "Permit and Fee Schedule" under "Helpful Resources" on the Commercial Permits Page for more information.