Temporary concrete batching plants (including associated stationary equipment and stockpiles) shall be located at least three hundred (300) feet from any recreational area, school, residence or other structure not occupied or used solely by the owner of the property upon which the facility is located. This distance limitation does not apply to structures within the boundaries of the project for which the facility is to pour concrete, provided that the facility is located on or contiguous to the project.
Submit the following documents through the TRAKiT Portal:
- Temporary Use Application
- Site Plan
- Tree Protection Plan
- Erosion Control Plan
- SWPPP
- If wastewater (non-storm water) is generated, then a TCEQ permit for discharge will be required. Submit a copy of TXR110000 authorization.