Generators

  • Information: New and replacement generators require a permit
  • Submittal Requirements
    • Residential Application (PDF)
    • Site Plan
    • Electrical Line Diagram
    • Manufacturer Specifications for Generator and Automatic Transfer Switch
    • Manufacturer Installation Guide for Generator
    • Load Calculations for sizing of generator
    • Photos of electric meter, breakers, and breaker panel
    • Utility provider notification required for Non-DME customers
  • Plan Submittal: Plans may be submitted electronically online through eTRAKiT or delivered in person to the Development Services Center at 401 N Elm Street with a set of paper plans.
  • Inspections Required: Finals
  • Fees: $150 minimum, see our Fee Schedule (PDF) for more information.