All door replacement requires a permit and is subject to 2021 energy codes and applicable amendments. Glazed door U-factor rating must be 0.32 or lower and Solar Heat Gain Coefficient (SHGC) must be 0.25 or lower.
Submittal Requirements
Plan Submittal
Plans may be submitted online electronically through eTRAKiT or delivered in person to the Development Services at 401 N Elm Street.
Inspections Required
Fees
$272 minimum; visit the Commercial Permits page to view the current Schedule of Fees.